ISSUANCE OF BUILDING INSPECTION CERTIFICATE FOR BUSINESS PERMIT ITEM II – ANNUAL INSPECTION

  • Business License
  • Detailed information about the Business and sketch of location (for new enterprises)
  • Application/Assessment Form

INFRASTRUCTURE SERVICES

MAINTAINING DRAINAGE SYSTEMS AND OTHER INFRASTRUCTURE.

Includes the following:

  • Cleaning of Drainage
  • Demolition Work
  • Repair of Roads and Shoulders
  • Repair of Drainage and Manholes
  • Repair of Buildings and Other facilities

Requirements:

  • Letter request specifying the service needed

BUILDING PERMITS – APPLICATIONS FOR PERMITS

Architectural Permit

  • Architectural Plans/Drawings
  • Architectural interiors/interior design
  • Plans and specific locations of all accessibility facilities
  • Detailed design of all such accessibility facilities outside and around buildings/structures including parking areas, and their safety requirements
  • Fire Safety Documents 6. Other related documents

STRUCTURAL PERMIT

  • Site Development Plan
  • Structural Plans
  • Structural Analysis and Design for all buildings/structures except for one storey and single detached building/structure with a total floor area of 20.00 sq. meters or less.
  • Boring and Load Tests
  • Seismic Analysis
  • Other related documents
  • Fire Safety Documents

ELECTRICAL PERMIT

This document is required before putting up new or additional, or alteration of electrical installations involving at least 20 outlets or a capacity of 4 Kw. For new buildings, this forms part of the requirements for a Building Permit application.

  • Location and Site Plan.
  • Legend or Symbols.
  • General Notes and/or Specifications
  • Electrical layout
  • Schedule of Loads, Transformers, Generating/UPS Units ( Total KVA for each of the preceding items shall be indicated in the schedule)
  • Design Analysis
  • One Line Diagram 8. Fire Safety Documents

MECHANICAL PERMIT

This is required before the installation of new additional, removal or alteration of machinery of at least 20 HP. For new buildings, this forms part of the requirements for a Building Permit application.

  • Location Plan and Key Plan
  • General Layout Plan for each floor, indicating the equipment in heavier lines than the building outline with names of machinery and corresponding brake horsepower shall be indicated.
  • Longitudinal and Transverse Sections of building and equipment.
  • Isometric drawing of gas, fuel, oil system showing: Assembly of pipes on racks and supports, Legend and General Notes, Capacity per outlet and complete individual piping system.
  • Plans drawn indicating location of store rooms, fuel tanks, fire extinguishing systems, fire doors fire escape ladders and other protective facilities.
  • Detailed drawings of all duct work installations, indicating dampers, controls, filters, fireproofing, acoustical and thermal insulation.
  • Detailed Plans of machinery foundations and supports.
  • Detailed Plans of boilers and pressure vessels with a working pressure of above 70 kPa regardless of KW rating.
  • Design Computations and Detailed plans of elevators and escalators.
  • For all installations, additions or alterations involving machinery of at most 14.9 kW, the signature of a duly licensed Mechanical Engineer shall be sufficient except fired and unfired pressure vessels, elevators, escalators, dumbwaiters, central/split/packaged type air conditioners and piping system of steam, gas or fuels.
  • Detailed plans of fire suppression systems, location of automatic and smoke detectors and alarm and initiating devices used to monitor the conditions that are essential for the proper operation including switches for the position of gate valves as well as alert and evacuation signals; the detailed layout of the entire safe area to be protected and the heat/smoke ventilation system.
  • Detailed drawings of all duct work installations, indicating dampers, controls, filters, fireproofing, acoustical and thermal insulation.
  • Detailed Plans of machinery foundations and supports.
  • Detailed Plans of boilers and pressure vessels with a working pressure of above 70 kPa regardless of KW rating.
  • Design Computations and Detailed plans of elevators and escalators.
  • For all installations, additions or alterations involving machinery of at most 14.9 kW, the signature of a duly licensed Mechanical Engineer shall be sufficient except fired and unfired pressure vessels, elevators, escalators, dumbwaiters, central/split/packaged type air conditioners and piping system of steam, gas or fuels.
  • Detailed plans of fire suppression systems, location of automatic and smoke detectors and alarm and initiating devices used to monitor the conditions that are essential for the proper operation including switches for the position of gate valves as well as alert and evacuation signals; the detailed layout of the entire safe area to be protected and the heat/smoke ventilation system.
  • Fire Safety Documents

SANITARY PERMIT

  • For deepwell, water purification plants, water collection and distribution systems, reservoirs, drainage and sewer systems, sewage treatment plants, malaria control structures, and sewage disposal systems.
    • Location Plan and Site Plan
    • Detailed Plan and layout drawings of minimum scale 1:100
    • Design Analysis and Technical Specifications IV. Cost Estimates
  • For pest and vermin control, sanitation, and pollution control facilities:
    • Detailed plan, layout and drawing of abatement and control device
    • Design analysis and technical specification
    • Cost Estimates

PLUMBING PERMIT

  • Location Plan and Site Plan
  • Plumbing Plans, Layout and Details
  • Legend and general Notes
  • Isometric drawing of the systems
  • Design analysis and technical specifications
  • Cost Estimates

ELECTRONICS PERMIT

  • General layout plans with legends
  • Single line diagram
  • Riser diagram
  • Isometry of the system
  • Equipment specification
  • Design analysis, as applicable
  • Cost estimates

EXCAVATION AND GROUND PREPARATION PERMIT

This permit is secured prior to actual ground preparation and excavation after the building line is established. It is also a requirement for a water connection request to the Polanco Water District and BAWASA. (as applicable)

  • Location Plan
  • Excavation Detailed Plan
  • Excavation Documents

FENCING PERMIT

This is to be secured prior to actual construction of a fence.

  • Fencing permit application
  • Fence plan
  • Site development plan
  • Cost estimates
  • Structural analysis and design (above 3m high, as applicable)
  • Lot plan with certification of a Geodetic Engineer that the proposed fence will not encroach on adjoining properties
  • Transfer Certificate of Title (TCT)
  • Deed of Sales/Lease Contract/Contract to Sell (if the TCT is not in the name of the owner/applicant)
  • Updated Real Property for Tax Declaration
  • Certificate of Real Property Tax Payment

DEMOLITION PERMIT

This permit is secured prior to the systematic dismantling or destruction of a building or structure in whole or in part.

  • Demolition permit application
  • Sketch Plan of area to be demolished
  • Picture
  • Certificate of Real Property Tax Payment

SCAFOLDING PERMIT

This permit is secured whenever the erection of scaffolding occupies street lines.

  • Lot Plan and Site Development Plan
  • Plans of Sign Structures and Computation
  • Cost Estimates
  • Land Title and Tax receipt

SIGN PERMIT

This permit is secured prior to the installation, erection, attachment, painting of any form of signages.

  • Sign Permit Form
  • Building Permit Form whenever there is a concrete/steel structure.
  • Structural Analysis
  • Zoning Clearance
  • Permit Form (DPWH Form No. 96- 001-E) whenever there is an electrical connection
  • Fire clearance whenever there is an electrical connection
  • Sketch Plan of signage/s to be installed/erected
  • Location/vicinity plan
  • Lot documents whenever it occupies a private lot
  • 10.DPWH clearance (for national roads/highways)

CERTIFICATE OF OCCUPANCY

  • The owner/permittee shall submit to the OBO an application for Certificate of Occupancy together with a duly notarized Certificate of Completion together with the construction logbook, As-built Plan and Specification and the Building Inspection Sheet all signed by whoever is the contractor (if the construction is undertaken by contract) and signed and sealed by the Owner’s duly licensed Architect or Civil Engineer who undertook the full time inspection.

Note:

  • Said Plans and Specifications shall reflect faithfully all changes, modifications and alterations made on the originally submitted Plans and Specifications on file with the OBO which are the basis of the issuance of the original building permit.
  • The as-built Plans and Specifications may be just an orderly and comprehensive completion of all the documents, which include the original plans and specifications as actually built or new set of plans accurately reflecting therein the building/structure as actually built.

ISSUANCE OF APPLICATION OF EQUIPMENT RENTAL (ERRO)

Rates:

VEHICLEPRIVATEGOVERNMENTHOURS
Road GraderPhp 9,000.00Php 8,000.008 Hours
PayloaderPhp 9,000.00Php 8,000.008 Hours
10PCI DumptruckN/AN/AN/A
BackhoePhp 9,000.00Php 8,000.008 Hours
  • Site Inspection
  • Scope/Nature of Work

ISSUANCE OF JOB ORDER OF FARM TRACTOR

Rates:

  • Harrowing – Php 1,800.00/hour
  • Plowing – Php 1,500.00/hour
  • Plus Php 10.00/km of mobilization

Requirements:

  • Site Inspection (for new applicant only)